Charles Percier
Set designs for the Arc du Carrousel, 1807
Pierre Noire, Pen And Black, Gray And Brown Ink, Black, Gray And Brown Wash, Some On Tracing Paper
Similar Lots to This Artwork
Pen And Black Ink, Gray Wash, Watercolor Over Black Stone Lines
61 x 79 cm
Gray And Brown Washes Over Black Stone Lines
50 x 67.5 cm
Pen And Black And Brown Ink, Gray And Brown Wash, Watercolor Over Black Stone Lines
66 x 95 cm
Pen And Black And Brown Ink, Gray And Brown Wash, Over Black Stone Lines, On Tracing Paper
64 x 48 cm
Pen And Black And Gray Ink, Watercolor Over Black Stone Lines
64 x 97 cm
Black pencil, pen and ink on several assembled sheets of paper
42.3 x 34.1 cm
Pen And Gray And Brown Ink, Brown Wash And Watercolor
64 x 43 cm
Pen And Black And Gray Ink, Gray Wash, Watercolor, On Black Stone Lines
51 x 117 cm
Pen and black ink and watercolor, over pencil
37.77 x 52.07 cm
More Lots by Charles Percier in This Sale
Recent Lots by Charles Percier
Charles Percier Works on Paper Performance
- Not Sold: 0.0%
- Below: 0.0%
- Within: 80.0%
- Above: 20.0%